Stage-Gate Checklist

What a steering committee should verify before passing each of the five gates in INA's Project Structuring Framework™ (F1).

01
Overview

How to Use This Checklist

Run through the relevant list before every steering committee meeting where a gate decision is on the agenda. Every unchecked item is a reason to delay the gate, not a reason to note it and proceed — a gate passed with open items just moves the risk downstream, where it costs more to fix.

02
Gate 1

Go/No-Go Decision

  • Is an executive sponsor formally designated, by name?
  • Is the problem defined in verifiable terms, not as a generic intention?
  • Does the Strategic Diagnosis Document exist and is it signed?
  • Is the Alignment Letter signed by all relevant stakeholder units?
  • Has at least a rough order-of-magnitude budget range been discussed?
03
Gate 2

Investment Decision

  • Have at least two comparable technical alternatives been evaluated?
  • Is the 5-Year Financial Model built and reviewed by someone outside the project team?
  • Is confirmed budget availability, or an identified funding source, in place?
  • Does the Preliminary Risk Matrix cover all ten F5 risk categories?
  • Has the Business Case been validated against at least one external benchmark?
04
Gate 3

Authorization to Launch Procurement

  • Was the contractual model legally validated before drafting tender documentation?
  • Is the RACI Matrix signed off by every party it names?
  • Do the technical specifications reflect the alternative selected at Gate 2, not an earlier draft?
  • Is a change management plan defined and resourced before implementation begins?
  • Have environmental and social screening steps been completed where applicable?
05
Gate 4

Solution Acceptance

  • Do delivered milestones match the Execution Plan's acceptance criteria?
  • Have all contractual SLAs been tested, not just documented?
  • Is the Go-Live Sign-off signed by both the PMO and the receiving operations team?
  • Are all open risk register items reviewed and either closed or explicitly carried into Phase V?
06
Continuous

Ongoing Monitoring Checks

  • Is the Performance Dashboard reviewed on a fixed cadence, not ad hoc?
  • Is adoption tracked at 30/60/90 days post-launch, per INA's standard KPI set?
  • Has the Closure & Lessons-Learned Report been drafted and shared beyond the immediate project team?
Next Step

Use this alongside INA's Project Structuring Framework™ Toolkit, or ask INA to facilitate a gate review. Request Advisory →