What a steering committee should verify before passing each of the five gates in INA's Project Structuring Framework™ (F1).
Run through the relevant list before every steering committee meeting where a gate decision is on the agenda. Every unchecked item is a reason to delay the gate, not a reason to note it and proceed — a gate passed with open items just moves the risk downstream, where it costs more to fix.